Launching Q1 2027. Join the waitlist for early access.
For Part 145 repair stations
Repair-station certificate layer (ratings, RSQM, 8130-3) — in development · Q1 2027

The maintenance backbone now — the certificate layer in development.

Work orders, parts inventory, vendors, and AD/SB tracking run today for maintenance teams. The full repair-station certificate layer — ratings, capability list, RSQM revision control, and 8130-3 records — is built and in testing for the first quarter of 2027.

Launching the first quarter of 2027.

Inside the Part 145 workspace

Repair stationWork ordersMaintenanceInventoryVendors

01Available today (maintenance core)

Work orders

Open a work order, set priority and assignee, and record the parts consumed per job — stock decrements as parts go on and restores if they come off. The job's history is one record, not a whiteboard line. It replaces work orders on a whiteboard with parts usage reconciled from memory.

Replaces: work orders on a whiteboard with parts usage reconciled from memory

  • Work orders with priority, status, and assignee
  • Parts consumed per job — stock decrements and restores
  • The job's history is one record, not a whiteboard line
Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

02Available today (maintenance core)

Parts inventory

Each part carries a real per-part minimum-quantity threshold and a facility location, and low-stock items are flagged before the shelf runs dry. It replaces guessing stock until a job stalls waiting for parts.

Replaces: guessing stock until a job stalls waiting for parts

  • Per-part minimum-quantity thresholds
  • A facility location per part
  • Low-stock items flagged before the shelf runs dry
Repair station
Maintenance core · live today
WOItemStatus
WO-3102PT6A hot-section inspectionHigh
WO-3098Recurring AD compliance — sample tailDue
WO-3091Prop overhaul — return to serviceNormal
Repair-station certificate layerIn development · Q1 2027
Ratings
RSQM
8130-3

Illustrative — every screen reflects your own data.

03Available today (maintenance core)

Vendors & purchase orders

Vendors and purchase orders link back to the same parts catalog, so reordering connects to the inventory it replenishes rather than living in email. It replaces POs tracked separately from stock.

Replaces: POs tracked separately from stock

  • Vendors and purchase orders linked to the parts catalog
  • Reordering connects to the inventory it replenishes
  • No POs tracked separately from stock
Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

04Available today (maintenance core)

AD/SB tracking

Airworthiness Directives and Service Bulletins sit on the Due-Soon → Overdue pipeline, and an AOG-risk score per aircraft surfaces which tail to look at first, shown with the factors behind it. The score is deterministic and explainable, not a black-box prediction. It replaces AD/SB applicability tracked in a binder nobody fully trusts.

Replaces: AD/SB applicability tracked in a binder nobody fully trusts

  • ADs and Service Bulletins on the Due-Soon → Overdue pipeline
  • An AOG-risk score per aircraft, shown with its factors
  • Deterministic and explainable — not a black-box prediction
Repair station
Maintenance core · live today
WOItemStatus
WO-3102PT6A hot-section inspectionHigh
WO-3098Recurring AD compliance — sample tailDue
WO-3091Prop overhaul — return to serviceNormal
Repair-station certificate layerIn development · Q1 2027
Ratings
RSQM
8130-3

Illustrative — every screen reflects your own data.

05In development · Q1 2027 In development

Repair-station ratingsIn development

In development, targeted for Q1 2027: repair-station ratings — airframe, powerplant, accessory — with their limitations. Built and in testing — not yet enabled in production.

  • In development for Q1 2027 — built and in testing
  • Airframe, powerplant, and accessory ratings
  • Each rating's limitations
Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

06In development · Q1 2027 In development

Capability listIn development

In development, targeted for Q1 2027: a self-evaluated capability list with revision control on each item. Built and in testing — not yet enabled in production.

  • In development for Q1 2027 — built and in testing
  • A self-evaluated capability list
  • Revision control on each item
Repair station
Maintenance core · live today
WOItemStatus
WO-3102PT6A hot-section inspectionHigh
WO-3098Recurring AD compliance — sample tailDue
WO-3091Prop overhaul — return to serviceNormal
Repair-station certificate layerIn development · Q1 2027
Ratings
RSQM
8130-3

Illustrative — every screen reflects your own data.

07In development · Q1 2027 In development

RSQM document controlIn development

In development, targeted for Q1 2027: Repair Station and Quality Manual sections moving DRAFT → PROPOSED → APPROVED → SUPERSEDED with a revision trail. Built and in testing — not yet enabled in production.

  • In development for Q1 2027 — built and in testing
  • RSQM sections: DRAFT → PROPOSED → APPROVED → SUPERSEDED
  • A revision trail per section
Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

08In development · Q1 2027 In development

8130-3 return-to-service recordsIn development

In development, targeted for Q1 2027: return-to-service records tied to their work orders. 8130-3 e-signature remains a separate third-party integration, not a built-in claim. Built and in testing — not yet enabled in production.

  • In development for Q1 2027 — built and in testing
  • Return-to-service records tied to their work orders
  • 8130-3 e-signature stays a separate integration
Repair station
Maintenance core · live today
WOItemStatus
WO-3102PT6A hot-section inspectionHigh
WO-3098Recurring AD compliance — sample tailDue
WO-3091Prop overhaul — return to serviceNormal
Repair-station certificate layerIn development · Q1 2027
Ratings
RSQM
8130-3

Illustrative — every screen reflects your own data.

09In development · Q1 2027 In development

Mechanic training recordsIn development

In development, targeted for Q1 2027: per-mechanic recurrent training history. Built and in testing — not yet enabled in production.

  • In development for Q1 2027 — built and in testing
  • Per-mechanic recurrent training history
Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

In every operation

The platform backbone, under every Part

The platform-wide backbone — the same under every FAR Part.

61.51 pilot logbook

Auto-fills from completed flights, manual entry, and ForeFlight CSV import/export.

Credentials vault

Certificates, ratings, medicals, and type ratings with auto-expiry alerts and document storage.

Work orders & inventory

Priority/status/assignee work orders, parts with reorder thresholds, vendors, and purchase orders.

Compliance pipeline

Every requirement on a Compliant → Due-Soon → Overdue timeline with a weekly admin digest.

Reports & dashboard

Utilization, currency, and activity KPIs with CSV export.

Audit trail

Every mutation recorded with actor, entity, and timestamp — searchable and exportable.

Time-limited auditor access

Read-only links for FAA/POI/external auditors that expire automatically — no shared logins.

Public REST API + webhooks

Bearer-token REST API (scoped) and HMAC-signed outbound webhooks for HRIS, ERP, and ops integrations.

Security & privacy

Tenant isolation, role-based access, per-employee surface restrictions, TOTP 2FA, and GDPR data export/erasure.

Today

What's slowing you down

  • Work orders on a whiteboard, parts usage reconciled from memory
  • AD/SB applicability tracked in a binder nobody fully trusts
  • RSQM revisions emailed around with no signed approval trail

With AviationAlley

What changes

  • Work orders with parts consumed per job, today
  • Parts inventory with real reorder thresholds
  • AD/SB on the Due-Soon → Overdue pipeline

Recommended for Part 145

Pro plan

Unlimited seats · priced to your fleet

Request a demo

Two FAR rule sets plus the DPE network. Right for mixed-ops (142+141 or 142+135) and corporate flight departments.

  • Two operation modules included
  • DPE network module
  • AQP add-on available
  • Stripe Connect for B2B billing
  • Priority support + onboarding

Frequently asked questions

Part 145 — common questions

Can I run a Part 145 repair station on AviationAlley today?+

The maintenance core is live now: work orders with parts consumed per job, parts inventory with real reorder thresholds, vendors and purchase orders, and AD/SB tracking. The repair-station certificate layer — ratings, capability list, RSQM document control, and 8130-3 records — is in development, targeted for Q1 2027.

Does AviationAlley file 8130-3 forms electronically?+

No. 8130-3 records are part of the in-development repair-station layer, targeted for Q1 2027, and the e-signature itself is a separate third-party integration — not a built-in claim today.

Built for Part 145.

Repair-station certificate layer (ratings, RSQM, 8130-3) lands in Q1 2027 — join the waitlist to get on it first.