Launching Q1 2027. Join the waitlist for early access.
Back to Part 91

Part 91 · In development · Q1 2027

In development · Q1 2027

Flight planning

In development, targeted for Q1 2027: route, fuel, and endurance planning with a go/no-go banner computed from the aircraft's performance profile. Built and in testing — not yet enabled in production.

Launching the first quarter of 2027.

Flight planning
N172SO · KORD → KMDW · alt KGYY
Within planning limitsadvisory · PIC is final authority
Fuel
Ground speed
100 kt
ETE
2:00
Total req
24.9 gal
Margin
+15.1 gal
Weight & balance
Gross wt
2260 lb
Margin
290 lb
CG
39.65 in
Envelope
In limits
Same engine the saved plan persists with · METAR/TAF brief on tap

Illustrative — every screen reflects your own data.

Who it's for

A corporate pilot who, once this ships, will plan route, fuel, and endurance for a trip instead of reaching for a separate planning tool.

What it replaces

The separate planning tool the department reaches for today, and the back-of-the-envelope fuel burn — replaced once this is in production.

What flight planning gives you

  • In development for Q1 2027 — built and in testing
  • Route, fuel, and endurance planning with a go/no-go banner
  • Computed from the aircraft's performance profile

Route, fuel, and endurance — in development for Q1 2027

This capability is in development, targeted for Q1 2027 and built and in testing — not yet enabled in production. Once it ships, a corporate pilot will plan route, fuel, and endurance for a trip, with the numbers computed from the aircraft's performance profile rather than a back-of-the-envelope fuel burn. Until it's in production, that planning still happens outside the platform.

  • In development for Q1 2027 — built and in testing
  • Route, fuel, and endurance planning with a go/no-go banner
Flight planning
N172SO · KORD → KMDW · alt KGYY
Within planning limitsadvisory · PIC is final authority
Fuel
Ground speed
100 kt
ETE
2:00
Total req
24.9 gal
Margin
+15.1 gal
Weight & balance
Gross wt
2260 lb
Margin
290 lb
CG
39.65 in
Envelope
In limits
Same engine the saved plan persists with · METAR/TAF brief on tap

A go/no-go banner from the performance profile

As planned, a go/no-go banner will compute from the aircraft's performance profile — route, fuel, and endurance together — as a planning aid the pilot reads before a trip. This is in development, targeted for Q1 2027, and is not a certified dispatch tool; the pilot in command stays the final authority.

  • In development for Q1 2027 — built and in testing
  • Computed from the aircraft's performance profile
Flight planning
N172SO · KORD → KMDW · alt KGYY
Within planning limitsadvisory · PIC is final authority
Fuel
Ground speed
100 kt
ETE
2:00
Total req
24.9 gal
Margin
+15.1 gal
Weight & balance
Gross wt
2260 lb
Margin
290 lb
CG
39.65 in
Envelope
In limits
Same engine the saved plan persists with · METAR/TAF brief on tap

How an operator uses this

This capability is in development, targeted for Q1 2027 and built and in testing — not yet enabled in production. Once it ships, a corporate pilot will plan route, fuel, and endurance for a trip, and a go/no-go banner will compute from the aircraft's performance profile rather than a back-of-the-envelope fuel burn. The intent is to replace the separate planning tool the department reaches for today; until it's in production, that planning still happens outside the platform.

Illustrative — every screen reflects what's in your own data, nothing more.

How it works

Flight planning, step by step

  1. Planned: enter the route for the trip.

  2. Planned: fuel and endurance will compute from the aircraft's performance profile.

  3. Planned: a go/no-go banner will reflect the route, fuel, and endurance together.

  4. Planned for Q1 2027 — built and in testing, not yet enabled in production.

Questions

Flight planning — frequently asked

Is flight planning available today?

Not yet. Flight planning with route, fuel, and endurance is in development, targeted for Q1 2027 — built and in testing, not yet enabled in production.

Where will the go/no-go banner come from?

It is planned to compute from the aircraft's performance profile — route, fuel, and endurance together. This capability is in development, targeted for Q1 2027.

Every Part 91 workspace also includes the platform-wide backbone — logbook, credentials, compliance, reporting, and audit trail.

See the backbone

See flight planning on your operation.

It's part of the in-development layer for Part 91, landing Q1 2027 — join the waitlist to get on it first.