Launching Q1 2027. Join the waitlist for early access.
Back to Part 142

Part 142 · Training Specifications & records

TS document control

Training Specifications live as controlled sections (A001 / A002 / B055 …) that move DRAFT → PROPOSED → APPROVED with the POI's sign-off name and date captured on the approving revision. Every save creates a new revision tied to the editor and timestamp, so the history is append-only and the current text is never in doubt. It replaces the TS document in a shared drive with no revision history.

Launching the first quarter of 2027.

Training Specifications
Section control · POI sign-off · revision log
§SectionState
A001GeneralApproved
A002AuthorizationsApproved
B055Curriculum — B737Proposed
C074Evaluator listDraft
B055 · Rev 7Awaiting POI sign-off
DRAFT → PROPOSED → APPROVED · append-only history · editor + timestamp on every revision
Rev 6 approved by POI J. Marsh · 06-12 · captured on the record

Illustrative — every screen reflects your own data.

Who it's for

The director of training who owns the center's Training Specifications and needs the current approved text — and the record of who changed what — never in doubt.

What it replaces

The TS document sitting in a shared drive with no revision history and no record of who changed what.

What ts document control gives you

  • Controlled sections (A001 / A002 / B055 …)
  • DRAFT → PROPOSED → APPROVED with POI sign-off name and date
  • Append-only revision log tied to editor and timestamp

Controlled sections with a real workflow

Training Specifications live as controlled sections — A001, A002, B055, and so on — that move through DRAFT → PROPOSED → APPROVED, with the POI's sign-off name and date captured on the approving revision. A section moves to PROPOSED when it's ready for the POI, and approval captures who signed off and when.

  • Controlled sections (A001 / A002 / B055 …)
  • DRAFT → PROPOSED → APPROVED with POI sign-off name and date
Training Specifications
Section control · POI sign-off · revision log
§SectionState
A001GeneralApproved
A002AuthorizationsApproved
B055Curriculum — B737Proposed
C074Evaluator listDraft
B055 · Rev 7Awaiting POI sign-off
DRAFT → PROPOSED → APPROVED · append-only history · editor + timestamp on every revision
Rev 6 approved by POI J. Marsh · 06-12 · captured on the record

An append-only revision log

Every save creates a new revision tied to the editor and the timestamp, so the history is append-only and the current text is never in doubt. It replaces the TS document sitting in a shared drive with no revision history — the current approved text and how it got there are both on the record.

  • Append-only revision log tied to editor and timestamp
  • Current approved text never in doubt
Endorsements
Per-trainee history · expiry · issuing CFI
Active
186
Lapsing 14d
4
Issued 30d
22
TraineeEndorsementStatus
Olsen, P.61.87 solo · in 64 daysActive
Reyes, D.61.31 complex · no expiryActive
Kim, J.61.65 IR rec. · in 5 daysLapsing
Tran, L.61.39 checkride · expiredRenew
Renewals create a new row · signed document stored · full history preserved

How an operator uses this

Training Specifications live as controlled sections — A001, A002, B055, and so on — that move through DRAFT → PROPOSED → APPROVED, with the POI's sign-off name and date captured on the approving revision. Every save creates a new revision tied to the editor and the timestamp, so the history is append-only and the current text is never in doubt. It replaces the TS document sitting in a shared drive with no revision history and no record of who changed what.

Illustrative — every screen reflects what's in your own data, nothing more.

How it works

TS document control, step by step

  1. Each TS section (A001 / A002 / B055 …) is a controlled document with its own state.

  2. Draft and edit a section; every save creates a new revision tied to the editor and timestamp.

  3. Move the section DRAFT → PROPOSED when it's ready for the POI.

  4. On approval, the POI's sign-off name and date are captured on the approving revision — the history stays append-only.

Questions

TS document control — frequently asked

Does it track Training Specifications revisions with POI sign-off?

Yes. Each TS section moves DRAFT → PROPOSED → APPROVED with the POI sign-off name and date captured on the approving revision. The history is append-only — every save creates a new revision tied to the editor and timestamp.

Can I tell what the current approved text is?

Yes. Because every save creates a new revision and approvals capture the POI sign-off, the current text and how it got there are never in doubt.

Every Part 142 workspace also includes the platform-wide backbone — logbook, credentials, compliance, reporting, and audit trail.

See the backbone

See ts document control on your operation.

It's part of the Part 142 workspace. Request a demo or join the waitlist.