Launching Q1 2027. Join the waitlist for early access.
Back to Part 121

Deep dive · 06Part 121

Reliability & reporting

Each tail gets a 0–100 aircraft-on-ground risk score that surfaces which aircraft to look at first, and every score is shown with the factors that contributed to it — airworthiness posture, inspection timing, utilization, and age. It is deterministic and explainable, not a black-box prediction: you see what drove the number, not a mystery output. It replaces guessing which tail is the next surprise AOG.

Launching the first quarter of 2027.

Maintenance & MRO
Work orders · parts · airworthiness
1 critical squawk grounds B737 FFS #1
WOItemPriority
WO-2048B737 FFS — visual squawkCritical
WO-2046A320 FFS — motion calibrationHigh
WO-2041C172 FTD — annual inspectionNormal
Open WOs
5
Parts low
2
Next insp
14 d

Illustrative — every screen reflects your own data.

What's in Reliability & reporting

Every capability in this part of the Part 121 workspace.

Predictive maintenance

A 0–100 AOG-risk score per tail — deterministic and explainable, with the contributing factors shown.

Each tail gets a 0–100 aircraft-on-ground risk score that surfaces which aircraft to look at first, and every score is shown with the factors that contributed to it — airworthiness posture, inspection timing, utilization, and age. It is deterministic and explainable, not a black-box prediction: you see what drove the number, not a mystery output. It replaces guessing which tail is the next surprise AOG.

Fleet utilization

Per-tail 30 / 90 / 365-day hours with an inspection countdown.

Per-tail hours over 30 / 90 / 365 days sit next to an inspection countdown, so planners see which aircraft is overworked and which inspection is closest. It replaces the utilization tally done by hand each month.

Manager daily digest

Today's ops and attention items emailed to managers each morning.

Managers get a morning email of today's operation and the items that need attention, so the day starts from a brief instead of a cold dashboard. It replaces piecing the morning picture together from several screens.

Reports & exports

Utilization, currency, and completion KPIs with CSV export.

Utilization, currency, and completion KPIs roll up across the operation and export to CSV for board packs or your own analysis. It replaces the month-end rebuild across disconnected tools.

See reliability & reporting on your operation.

It's part of the Part 121 workspace. Request a demo or join the waitlist.