Launching Q1 2027. Join the waitlist for early access.
Back to Part 145

Deep dive · 02Part 145

Repair-station certificate layer (ratings, RSQM, 8130-3) — in development · Q1 2027

In development · Q1 2027

Built and in testing; not yet enabled in production.

Launching the first quarter of 2027.

Repair station
Maintenance core · live today
WOItemStatus
WO-3102PT6A hot-section inspectionHigh
WO-3098Recurring AD compliance — sample tailDue
WO-3091Prop overhaul — return to serviceNormal
Repair-station certificate layerIn development · Q1 2027
Ratings
RSQM
8130-3

Illustrative — every screen reflects your own data.

What's in In development · Q1 2027

What ships today and what's in development for Part 145.

Repair-station ratings

In development

Airframe / powerplant / accessory ratings and limitations.

In development, targeted for Q1 2027: repair-station ratings — airframe, powerplant, accessory — with their limitations. Built and in testing — not yet enabled in production.

Capability list

In development

Self-evaluated capability list items with revision control.

In development, targeted for Q1 2027: a self-evaluated capability list with revision control on each item. Built and in testing — not yet enabled in production.

RSQM document control

In development

DRAFT → PROPOSED → APPROVED → SUPERSEDED sections.

In development, targeted for Q1 2027: Repair Station and Quality Manual sections moving DRAFT → PROPOSED → APPROVED → SUPERSEDED with a revision trail. Built and in testing — not yet enabled in production.

8130-3 return-to-service records

In development

RTS records tied to work orders (8130-3 e-signature stays a separate integration).

In development, targeted for Q1 2027: return-to-service records tied to their work orders. 8130-3 e-signature remains a separate third-party integration, not a built-in claim. Built and in testing — not yet enabled in production.

Mechanic training records

In development

Per-mechanic recurrent training history.

In development, targeted for Q1 2027: per-mechanic recurrent training history. Built and in testing — not yet enabled in production.

See in development · q1 2027 on your operation.

Repair-station certificate layer (ratings, RSQM, 8130-3) lands in Q1 2027 — join the waitlist to get on it first.